Tuberculosis Diagnostic Laboratory# 1 MEP (Mechanical/Electrical/Plumbing) Works

Site: Indus Hospital, Karachi
Engineering discipline: Mechanical, Electrical & Plumbing
Commissioning: October 2008
Services Provided: Design, Procurement, Installation, Commissioning and Maintenance

Scope of work:

  • Ventilation/air-conditioning design, supply, installation and commissioning as per international WHO/ASHRAE/CDC standards
  • Air ducting work, refrigerant tubing work and insulation work of ducts and pipes
  • Complete electrical work of laboratory including cabling work, electrical control panels, DBs, power sockets, etc.
  • Architectural finish including flooring, ceiling, walls as per international guidelines
  • Instrumentation and control work including building management system (BMS) for HVAC system to monitor and control laboratory negative pressure and HEPA differential pressure, etc.
  • Installation and validation of biological safety cabinet along with its exhaust system
  • Plumbing works including water supply and drainage
  • Air balancing work as per design
  • Yearly operation and maintenance contract of installed HVAC system
  • Documentation including as-built drawings, operation & maintenance manual and spare parts list